Connect with us

City, FDOT identify large road projects in downtown St. Pete

September 30, 2021 - Forward Pinellas, the City of St. Petersburg and the Florida Department of Transportation (FDOT) have identified potential road projects that will improve connectivity and safety in downtown St. Petersburg.   The identified projects include: 

  • Interstate I-175 or I-375 modification, redesign or removal to enhance connectivity throughout downtown and to surrounding neighborhoods
  • 3rd  and 4th Streets: Conversion to two-way roads for a more walkable community, reduce trip lengths and improve access
  • 5th and 4th Avenues: Conversion to two-way roads for more connectivity and to promote safety
  • Dr. MLK Jr Street and 8th Street: Conversion to two-way roads to promote safety and improve access to businesses
The groups are asking the public to weigh in on these potential solutions. Throughout October, there will be one in-person and four online discussions. The in-person meeting will be held Oct. 19 from 4 p.m. to 6 p.m. in the student center ballroom at the St. Pete University of South Florida campus.  Those interested can register here

More Zaps Frontpage

The St. Pete Catalyst

The Catalyst honors its name by aggregating & curating the sparks that propel the St Pete engine.  It is a modern news platform, powered by community sourced content and augmented with directed coverage.  Bring your news, your perspective and your spark to the St Pete Catalyst and take your seat at the table.

Email us: spark@stpetecatalyst.com

Subscribe for Free

Share with friend

Enter the details of the person you want to share this article with.